ED5 Substation Erosion Repairs

Date Completed 2017-06-26
City: Eloy
State: AZ
Type of Work:
  • Construction
NAICS Code(s):
PSC Code(s): --
Type of Government Agency:
  • Western Area Power Administration
Award Amount: $290,457
Contracting Set Aside: 8(a)
Details:

Perform excavation, compact fill, install rip rap protection at an existing Western Area Power Administration Substation yard which sustained erosion damage throughout the site due to large storms. Construct cast in place headwall for drainage culvert to mitigate erosion of around the culvert.  Remove built up sediment from existing drainage channels to allow proper flow of storm-water discharge.